Slab, Base, Excavation and Rebar Project Calculator

Formula

A = Length × Width; V = A × Slab thickness/100 × (1+Waste allowance/100); L = ((ceil(Width/(Rebar grid spacing/100))+1) × Length + (ceil(Length/(Rebar grid spacing/100))+1) × Width) × (1+Waste allowance/100)

Planning estimate. Check product specifications and local requirements before purchasing.

Worked example: Slab Foundation Project Calculator

Measurements in this example

Length10 m
Width8 m
Slab thickness15 cm
Compacted base depth20 cm
Rebar grid spacing20 cm
Waste allowance7 %

Calculated quantities

Excavation volume28 m³
Compacted base17.12 m³
Concrete for post holes12.84 m³
Length with allowance875.26 m

What to check

This calculation uses: Length, Width, Slab thickness, Compacted base depth, Rebar grid spacing, Waste allowance. It returns: Excavation volume, Compacted base, Concrete for post holes, Length with allowance.

Use dimensions from the structural drawings and check excavation against them before concrete or steel is ordered.

The ordering figure excludes pump priming, severe overbreak and unrecorded level changes unless they are included in the inputs.

Foundation size, reinforcement, cover, joints and bearing conditions are structural decisions that require a qualified design.

Use the units beside each field. The values in the worked example are starting inputs; replace them with your measurements and the specifications of your material.

Compare alternatives

Open a tool, enter your measured dimensions, then save an estimate. Keep another version if you want to compare products or allowances.

Project sheet

Saved in this browser. Each entry keeps its own measurements. Quantities from different jobs are not added together.

Your sheet is empty. Save a calculation to keep it here.

The project sheet stays on this device. Clearing browser data removes it.